(a) In General.--Chapter 11 of title 14, <<NOTE: 14 USC prec.
1181.>> United States Code, is amended by adding at the end the
following:
``Subchapter V--Coast Guard Mission Readiness
``Sec. 1181. <<NOTE: 14 USC 1181.>> Special appropriations
``In <<NOTE: Time period. Expiration date.>> addition to amounts
otherwise available, there is appropriated to the Coast Guard for fiscal
year 2025, out of any money in the Treasury not otherwise appropriated,
$24,593,500,000, to remain available until September 30, 2029,
notwithstanding paragraphs (1) and (2) of section 1105(a) and sections
1131, 1132, 1133, and 1156, to use expedited processes to procure or
acquire new operational assets and systems, to maintain existing assets
and systems, to design, construct, plan, engineer, and improve necessary
shore infrastructure, and to enhance operational resilience for
monitoring, search and rescue, interdiction, hardening of maritime
approaches, and navigational safety, of which--
``(1) $1,142,500,000 is provided for procurement and
acquisition of fixed-wing aircraft, equipment related to such
aircraft and training simulators and program management for such
aircraft, to provide for security of the maritime border;
``(2) $2,283,000,000 is provided for procurement and
acquisition of rotary-wing aircraft, equipment related to such
aircraft and training simulators and program management for such
aircraft, to provide for security of the maritime border;
``(3) $266,000,000 is provided for procurement and
acquisition of long-range unmanned aircraft and base stations,
equipment related to such aircraft and base stations, and
program management for such aircraft and base stations, to
provide for security of the maritime border;
``(4) $4,300,000,000 is provided for procurement of Offshore
Patrol Cutters, equipment related to such cutters, and program
management for such cutters, to provide operational presence and
security of the maritime border and for interdiction of persons
and controlled substances;
``(5) $1,000,000,000 is provided for procurement of Fast
Response Cutters, equipment related to such cutters, and program
management for such cutters, to provide operational presence and
security of the maritime border and for interdiction of persons
and controlled substances;
``(6) $4,300,000,000 is provided for procurement of Polar
Security Cutters, equipment related to such cutters, and program
management for such cutters, to ensure timely presence of the
Coast Guard in the Arctic and Antarctic regions;
``(7) $3,500,000,000 is provided for procurement of Arctic
Security Cutters, equipment related to such cutters, and program
management for such cutters, to ensure timely presence of the
Coast Guard in the Arctic and Antarctic regions;
``(8) $816,000,000 is provided for procurement of light and
medium icebreaking cutters, and equipment relating to such
cutters, from shipyards that have demonstrated success in the
cost-effective application of design standards and in
delivering, on schedule and within budget, vessels of a size and
tonnage that are not less than the size and tonnage of the
cutters described in this paragraph, and for program management
for such cutters, to expand domestic icebreaking capacity;
``(9) $162,000,000 is provided for procurement of Waterways
Commerce Cutters, equipment related to such cutters, and program
management for such cutters, to support aids to navigation,
waterways and coastal security, and search and rescue in inland
waterways;
``(10) $4,379,000,000 is provided for design, planning,
engineering, recapitalization, construction, rebuilding, and
improvement of, and program management for, shore facilities, of
which--
``(A) $425,000,000 is provided for design, planning,
engineering, construction of, and program management
for--
``(i) the enlisted boot camp barracks and
multi-use training center; and
``(ii) other related facilities at the
enlisted boot camp;
``(B) $500,000,000 is provided for--
``(i) construction, improvement, and dredging
at the Coast Guard Yard; and
``(ii) acquisition of a floating drydock for
the Coast Guard Yard;
``(C) not more than $2,729,500,000 is provided for
homeports and hangars for cutters and aircraft for which
funds are appropriated under paragraph (1) through (9);
and
``(D) $300,000,000 is provided for homeporting of
the existing polar icebreaker commissioned into service
in 2025;
``(11) $2,200,000,000 is provided for aviation, cutter, and
shore facility depot maintenance and maintenance of command,
control, communication, computer, and cyber assets;
``(12) $170,000,000 is provided for improving maritime
domain awareness on the maritime border, at United States ports,
at land-based facilities and in the cyber domain; and
``(13) $75,000,000 is provided to contract the services of,
acquire, or procure autonomous maritime systems.''.