Requires the Secretary of the Navy to submit to the congressional defense committees a 15-year acquisition, modernization, and sustainment plan -- including analysis of the role of advanced technologies in modernizing existing platforms -- for the carrier air wings of the Navy.
Requires the Secretary of the Navy to submit to the congressional defense committees a 15-year acquisition, modernization, and sustainment plan for the carrier air wings of the Navy.
Requires the plan to include an analysis of how advanced technologies such as Next Generation Jammer can be utilized to maximize operational use of existing platforms, particularly the EA-18G aircraft and the E-2D aircraft.
Key facts
🏛️ This document has been enacted by the United States Congress.
For authoritative text and metadata, visit the official source.
🎯 This document primarily applies to the government, rather than the private sector.
📜 This document's name is National Defense Authorization Act for Fiscal Year 2022, Section 126 ("Acquisition, modernization, and sustainment plan for carrier air wings").
AGORA also tracks this document under the name FY2022 NDAA, Section 126 ("Acquisition, modernization, and sustainment plan for carrier air wings"). It is part of FY2022 NDAA.
↳ This document is part of a longer one: FY2022 NDAA.
Some AGORA documents are "split off" from longer documents that mix AI
and non-AI content, such as omnibus authorization or appropriations laws
in the United States Congress. Read more >>
Themes AI risks, applications, governance strategies, and other themes addressed in AGORA documents.
This is an unofficial copy. The document has been
archived and reformatted in plaintext for AGORA. Footnotes, tables, and
similar material may be omitted. For the official text, visit the original source.
SEC. 126. ACQUISITION, MODERNIZATION, AND SUSTAINMENT PLAN FOR CARRIER AIR WINGS.
(a) Plan Required.--Not later than April 1, 2022, the Secretary of the Navy shall submit to the congressional defense committees a 15-year acquisition, modernization, and sustainment plan for the carrier air wings of the Navy.
(b) Elements.--The plan required by subsection (a) shall include the following:
(1)(A) An assessment of whether and to what extent the capabilities, capacity, and composition of the carrier air wings in existence as of the date of plan meet the requirements of the National Defense Strategy; and
(B) a plan to address any known shortfalls of such carrier wings, including shortfalls with respect to aerial refueling aircraft capacity and strike-fighter combat radius.
(2) An operational risk assessment and risk mitigation plan regarding the nine carrier air wings that, as of the date of the plan, support combatant commander steady-state peacetime and potential major contingency requirements.
(3) An explanation of when the Secretary of the Navy will field a minimum of 10 carrier air wings in accordance with section 8062(e) of title 10, United States Code.
(4) An identification and explanation of the role of autonomous and remotely-piloted aircraft, including the MQ-25 aircraft, and other potential capabilities and platforms planned to be fielded in future carrier air wings.
(5) A detailed deck and hangar space plan that supports realistic peacetime steady-state or contingency surge level fixed-wing aircraft and rotorcraft preparation activities, flight operations, and onboard unit-level maintenance, repair, and sustainment activities for future carrier air wings.
(6) An appropriate modernization plan to maximize operational use of platforms in existence as of the date of the plan, particularly the EA-18G aircraft and the E-2D aircraft, by leveraging available technologies such as Next Generation Jammer.
(7) An identification of the logistics supply chain support and modernization plan required during peacetime steady-state and contingency operations for future carrier air wings, particularly as it relates to implementing the organic C-130 and C-40 logistics tethering strategy.
(8) A detailed explanation for the Secretary of the Navy's decision to modify carrier air wing composition to one squadron of 14 F-35C aircraft instead of the originally planned two squadrons of 10 F-35C aircraft.
Mandates Navy submit 15-year plan for carrier air wings' acquisition, modernization, and sustainment.
Mandates Navy submit 15-year plan for carrier air wings' acquisition, modernization, and sustainment.